Strip-out
Old tiles, fittings and damaged sheeting removed and taken away. This is also when any hidden water damage shows itself.
A bathroom is the hardest room in the house to get right, because most of what keeps it working is buried. Falls, membrane, bond breakers, hob detailing and the junction between wall and floor all have to be correct before a single tile goes on.
We run the whole sequence in the right order and give it time to cure. Waterproofing that gets tiled over the same afternoon is the single most common cause of the leaks we get called out to repair a few years later.
Indicative sequence — your quote comes with dates against each stage.
Old tiles, fittings and damaged sheeting removed and taken away. This is also when any hidden water damage shows itself.
Plumbing and electrical relocated and roughed in, wall sheeting replaced, and framing corrected where needed.
Primer, bond breakers, corner reinforcement and membrane coats — applied to the required heights and left to cure.
Floor screeded so water runs to the waste from every point in the shower, with no ponding left behind.
Set-out marked first, then tiling — including niches, hobs, shelves and the mitres on external corners.
Grouting, silicone to all movement junctions, fittings back on, final clean and a walk-through with you.
Rough guides to scope, not fixed prices — every bathroom is quoted on what is actually behind the walls.
Existing layout and plumbing stay. Tiles off, waterproofing renewed, new tile on. The quickest way to change how the room reads.
Same footprint, everything new. Sheeting, waterproofing, screed, tile, vanity, screen and tapware.
Move the shower, lose the bath, change the door. Plumbing and framing relocated to a new layout.
A re-tile is commonly a few days. A full renovation is typically one to two weeks, driven mostly by curing time for the membrane and screed and by the lead time on fittings. If you have only one bathroom, tell us — we will tighten the sequence where we can.
Yes. For full renovations we coordinate the licensed trades so the rough-in, waterproofing and tiling happen in the right order. You can also use your own trades if you prefer — we will work to their dates.
Yes. You get a record of the membrane system used and where it was applied. If your strata, insurer or a future sale needs evidence that the wet area was done properly, it is there.
A like-for-like bathroom renovation generally does not, but moving walls or plumbing, or working in a strata building, can trigger owners corporation approval or a development application. We will flag it if your job looks like one of those.
We measure, look behind the obvious, and price the job you actually have.